News & Events

Successful Retrofit of Trip Valve Actuation Systems at Geothermal Plant by PT PM Control Systems Using Woodward VariStroke-GI

A major success was achieved in retrofitting the control system at a geothermal power plant. The team of technicians successfully replaced the outdated control system with a sophisticated Woodward control system. The old control system, consisting of components that were no longer in production, often experienced problems and resulted in costly downtime. By replacing the old control system with the modern Woodward control system, the geothermal power plant now operates more efficiently and reliably. This new control system enhances reliability and safety, and offers improved monitoring and control capabilities. This allows the operations team to optimize power plant performance and minimize downtime, resulting in significant increases in energy production and profits. This retrofit is a successful example of how Woodward solutions can enhance the efficiency and reliability of geothermal power plants, supporting the transition to a more sustainable renewable energy future.Readmore

screenshot_2024-11-15_081346.png